Recording Decisions

A Decision is an explicit commitment made under uncertainty.

Decisions connect Intent to Change and assign responsibility.

Why Decisions Must Be Fixed

Undocumented Decisions disappear.

When they disappear:

  • alternatives are reconsidered repeatedly
  • the same debates resurface
  • responsibility becomes unclear
  • incidents lack context

Fixing Decisions preserves intent across time.

What a Decision Is

A Decision:

  • chooses one option among alternatives
  • accepts specific trade-offs
  • commits the system to a direction
  • has an identifiable owner

What a Decision Is Not

A Decision is not:

  • consensus ("everyone agreed")
  • a vague agreement
  • an implementation detail
  • a post-hoc justification

Decision Record Structure

A Decision record typically includes:

  • context
  • decision statement
  • alternatives considered
  • rationale
  • consequences
  • owner
  • date

Brevity is a virtue.

Examples

❌ Bad Decision Record

"We decided to use PostgreSQL"

Problems:
- No context (why?)
- No alternatives (what else was considered?)
- No rationale (why PostgreSQL?)
- No owner
- No date

✅ Good Decision Record

Context: Need to store user profile data with uniqueness constraints on email.

Decision: Use separate table user_profile with PRIMARY KEY on email, instead of JSONB in user.metadata.

Alternatives Considered:
1. Keep in JSONB with application-level uniqueness check
2. Use PostgreSQL UNIQUE constraint on JSONB field
3. Use separate table (chosen)

Rationale:
- Database-level uniqueness is more reliable
- Easier to query and index
- Normalized structure supports future requirements

Consequences:
- Requires migration of existing data
- Adds complexity (two sources of truth during transition)
- Better long-term maintainability

Owner: Data engineer

Date: YYYY-MM-DD

Why it's good:
- Clear context
- Explicit alternatives
- Documented rationale
- Acknowledged consequences
- Owner and date

When to Record Decisions

Record decisions when:

  • choosing between significant alternatives
  • accepting trade-offs
  • making architectural choices
  • setting constraints or policies
  • changing direction from previous decisions

Don't record:

  • trivial implementation choices
  • obvious selections
  • temporary workarounds (unless they become permanent)

Decisions vs Implementation

Implementation may evolve.

The Decision remains stable unless explicitly revisited.

Changing implementation does not automatically change the Decision.

Changing the Decision requires a new Decision.

Example:

Decision (YYYY-MM-DD): Use separate table for user profiles

Implementation (YYYY-MM-DD): Added database entity

Implementation (YYYY-MM-DD): Optimized queries

The Decision stays the same. Only implementation changes.

Decision Ownership

Every Decision must have:

  • a single accountable owner
  • a clear scope
  • an explicit rationale

Many people may contribute.

One person decides.

Decisions Under Uncertainty

Decisions are made without complete information.

This is expected.

A good Decision:

  • states assumptions
  • acknowledges uncertainty
  • accepts bounded risk

Waiting for certainty is itself a Decision.

Decision Drift

Decision drift occurs when:

  • implementation diverges silently
  • constraints erode
  • ownership is lost

Drift is prevented by:

  • explicit records
  • periodic review
  • visible ownership

Where to Record Decisions

Decisions can be recorded in:

  • Change Plan documents (section "Decisions")
  • Architecture Decision Records (ADR)
  • Dedicated decision log
  • Code comments (for code-level decisions)

Choose what works for your team.

Checklist

Before finalizing a Decision:

  • [ ] Context is clear
  • [ ] Decision statement is explicit
  • [ ] Alternatives are documented
  • [ ] Rationale is explained
  • [ ] Consequences are acknowledged
  • [ ] Owner is assigned
  • [ ] Date is recorded

Example Template

## Decision: [Title]

**Context:** [Why this decision is needed]

**Decision:** [What we decided]

**Alternatives Considered:**
1. [Alternative 1] - [Why rejected]
2. [Alternative 2] - [Why rejected]
3. [Chosen alternative] - [Why chosen]

**Rationale:** [Why this decision]

**Consequences:** [What this means]

**Owner:** [Name/Role]

**Date:** YYYY-MM-DD